Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
Deschutes Brewery | Multi-Phase Production Expansion
Project type
Deschutes Brewery
Date
2023
This comprehensive expansion of the Deschutes Brewery production facility spanned Phases 2, 3, and 4, involving the complex integration of multiple pre-engineered metal buildings into the existing infrastructure. The project significantly increased operational capacity, adding specialized space for larger fermenters, brew tanks, and a state-of-the-art bottling line, alongside high-storage chilled warehouses and a dedicated three-story waste treatment building. A critical component of this development was the EPA Phase 1 ESA and brownfield remediation required to transform the site from its former use as a lumber mill into a modern industrial hub.
The final phase introduced a new three-story office building, topped by the iconic Mountain Room—a 250-person hospitality suite supported by a 1,000-square-foot commercial catering kitchen. Simultaneously, renovations at the Bond Street Brew Pub required a complete floor-plan swap of the kitchen and brew house. This high-stakes logistical challenge was executed seamlessly, ensuring the pub remained fully operational without a single day of closure. From technical industrial cooling systems to high-end hospitality finishes, these projects represent a total transformation of Deschutes’ production and public-facing footprint.



